Input: Proposed Claim / QuestionThe matter presented for possible examination. It is not yet a framed evidentiary question.
↓
Phase 0: Authority and Scope GatePre-work gate before the six-phase lifecycle. Confirm authority to perform the work, authority to disclose, work mode, scope, access limits, proportionality, and release constraints.
↓
Six-phase lifecycle begins: 1. FrameConvert the proposed matter into a bounded evidentiary question. State assumptions, competing explanations, what would support each explanation, and what would break it.
↓
2. PreservePreserve evidence, source identity, condition, custody boundaries, transfer integrity, automation records, and AI contribution records where material.
↓
3. CorroborateTest material claims against independent sources and test whether each material extraction is complete and faithful for the question asked.
SupportedIndependent evidence supports the claim without sharing the same failure mode.
ConflictSources contradict each other; the conflict becomes evidence to investigate.
Unsupported / UnavailableCorroboration, access, or completeness is absent; the limitation is stated and affects classification.
↓
4. AnalyzeInterpret evidence, prior work, tool-derived outputs, layered infrastructure, standards mappings, and derivative presentations without treating summaries as source evidence.
Automation may assist retrieval, correlation, summarization, pattern proposal, and drafting. Human judgment only beyond this point.
5. AdjudicateA person sets the conclusion, states the support basis for known findings, marks undetermined findings as pending or exhausted, and keeps assumptions visible.
KnownSupported by evidence within stated scope and limits, with support basis stated.
AssumedRelied on for a stated, limited purpose without being directly established.
UndeterminedUnresolved on available evidence; marked pending if being pursued or exhausted if proportionate inquiry is complete.
↓
6. ReportState findings, authority, scope, mode, evidence, reasoning, limits, contrary evidence, assumptions, AI role, automation contribution, and release authority.
↓
Defensibility CheckIf the finding cannot be traced, bounded, reproduced from preserved evidence, explained with its limits, and released under identified authority, it returns to the phase where the gap opened.
↓
Finding Released or ReturnedOnly findings that pass the standing check leave the practice.
Version 1.1 Controls Added to the Flow
These controls are not separate lifecycle phases. They are checks that must be carried through Phase 0 and the six-phase lifecycle when material to the engagement.
Authority and disclosureAuthority to work and authority to release evidence, findings, or reports are identified separately.
Source completenessMaterial queries, exports, parses, and summaries are checked for completeness and faithful extraction.
Transfer or retained custodyTransfers record packaging, encryption, delivery, and receipt; retained-custody work records the boundary that material never left.
Prior work as source materialPrior reports, examiner findings, and investigative summaries are tested against underlying evidence before reliance.
Narrowing is not attributionSuspect, account, device, system, or source narrowing states the remaining candidate pool and what is needed for stronger attribution.
Layered responsibilityTechnical delivery, account ownership, operational control, legal responsibility, and financial benefit are not collapsed into one finding.
Standards mappingCompliance, alignment, or deviation findings identify the standard, version, requirement, applicability basis, evidence, and interpretive limit.
Tool-derived outputsMeasurements, enhancements, comparisons, calculations, and transformations state processing basis, validation checks, and uncertainty limits.
Derivative presentationsExcerpts, compilations, timelines, transcripts, edited videos, and visualizations identify source links, selection criteria, excluded context, and non-substitution limits.